TRAVEL ADVISORY | ||
September 20, 2019 | ||
|
||
At 7 p.m. each evening, the northbound tunnel will be closed, and all traffic will be bi-directional in the southbound tunnel until the patterns are lifted, by 8 a.m. the next morning. The restrictions are necessary to allow crews to safely perform milling and paving work inside the northbound tunnel. The Lehigh Tunnel is located between milepost A70.2 and A71.5 between the Lehigh Valley, Exit 56, and Mahoning Valley, Exit 74, interchanges. Message boards will be activated to update motorists of any changes to the schedule caused by inclement weather or unforeseen traffic conditions. If the work is delayed, it will take place on the next available day. To report an accident or other emergency on the PA Turnpike, dial *11 via mobile phone. To learn more about PA Turnpike conditions or to contact us, use one of these resources: ON THE PA TURNPIKE · Variable & Digital Message Signs — nearly 100 signs along the Turnpike BY PHONE · Turnpike Roadway Information Program (toll-free) — 866-976-TRIP (8747) ON THE WEB · TRIPTalk — free, travel-alert smartphone app; download at https://www.paturnpike.com/travel/trip_talk.aspx |
||
CONTACT: | Kathleen Walter, 610.313.6383/267.326.3856 | |
### |
||