|
COMMISSION NEWS RELEASE | |||||
|
|||||
Bridge Beam Removal to Close Northeastern Extension this Weekend I-476 will be shut down for six hours Sunday between Mid-County and Lansdale. |
|||||
The Pennsylvania Turnpike Commission cautions motorists that an 11-mile stretch of the Pa. Northeastern Extension (I-476) will be closed in both directions for six hours Sunday, Feb. 3, between Mid-County (Exit #20) and Lansdale (Exit #31). The closure is necessary for the protection of motorists and construction workers during removal of steel girders from the bridge that carries Sumneytown Pike (State Route 63) over the Turnpike at milepost A30.6 in Towamencin Township, Montgomery County. At 12:01 a.m. Sunday morning, Feb. 3, all southbound traffic will be diverted off at the Lansdale Interchange. Motorists wishing to travel north from the Mid-County Interchange, or the east/west Turnpike mainline, will be directed to exit I-276 at the Fort Washington Interchange to return to I-476 at Lansdale. The Pennsylvania Turnpike mainline will re-open one lane in each direction to traffic by 6 a.m. Sunday morning. Prior to the shut-down on Saturday night (Feb. 2), motorists should be prepared for the left lane to be closed 8 p.m. southbound and 9 p.m. northbound when traveling within the established work zone located between milepost A28-A32. The speed limit will be posted at 40 mph until the patterns are lifted by 9 a.m. Sunday morning. Construction-zone speed limits are enforceable and fines will be doubled. Pennsylvania State Police and Turnpike personnel will be positioned at the Lansdale, Mid-County and Norristown interchanges to assist motorists. Motorists can tune to radio 1640 AM for detour information and traffic conditions or call the Turnpike Roadway Information line at 866.976.8747. Changeable message signs will also provide updated information regarding closures and detours. Motorists are encouraged to plan their travel accordingly. For emergencies, dial *11 on your mobile phone. DETOURS
For more information visit www.paturnpike.com/ConstructionProjects/mpA20toA31 or call the project hotline at 1-877-855-2545. In case of inclement weather, the closure will be rescheduled for Feb. 9-10 with times and detour information still applicable. |
|||||
### |
|||||