|
|
C O M M I S S I O N N E W S R E L E A S E |
||
Contact: |
Joe Agnello (724) 755-5262, (724) 755-5142 fax e-mail: jagnello@paturnpike.com |
June 18, 2002 |
TRAFFIC ADVISORY: Lane Restrictions, Intermittent Traffic Stoppages on
Tap for Tomorrow at the Gateway Plaza Near the Ohio Line Pennsylvania
Turnpike motorists near the Ohio will face single-lane restrictions and
intermittent traffic stoppages lasting no more than 15 minutes on Wednesday,
June 19, to facilitate the relocation of two overhead signs near the Gateway
toll plaza on the Interstate 76 mainline. The
work is part of a $17.6 million renovation of the Gateway facility, located
1.4 miles into Pennsylvania, contracted to the Joseph B. Fay Company of
Pittsburgh. A
single-lane pattern will take effect for westbound traffic at about 5:30 am
and as many as three brief stoppages of westbound traffic, the first
starting at about 7 am, could follow. Restrictions for westbound traffic
should be lifted by 10 am. On
the eastbound side of the Turnpike, a single-lane pattern will take effect
at about 9 am and up to three brief stoppages of eastbound traffic will
follow. The stoppages should conclude before noon and all restrictions for
westbound traffic should be lifted by 3 pm. The overhead signs being moved will be offset by an additional 30 to 40 feet because the plaza is being widened from 11 to 13 lanes. Renovation work at Gateway is to conclude by May 16, 2003. |
||
### |
||
P.O. Box 67676, Harrisburg, PA 17106-7676 Phone: (717) 939-9551 Fax: (717) 986-9649 |